Madison Metropolitan Sewerage District 50 Year Master Plan

The documents shown below are in PDF format.  If you don't have the Adobe PDF Reader, you can download it here.

1. Executive Summary
2. Introduction
3. Flows/Loadings
4. Conveyance System
       Figure 4-1 Existing MMSD Collection System Normal and Alternative Operating Modes
       Table 4-2 Existing Pumping Station Summary (2010)
       Table 4-3 Collection System Facilities Plan Priority Ranking (2008)
       Table 4-4 Existing MMSD Force Mains
       Table 4-5 Existing Pumping Station Flows in MGD (1996-2006)
       Table 4-6 Gravity Conveyance Facilities
       Table 4-7 Televising History
       Table 4-8 Pumping Stations Tributary to MMSD (2006)
       Table 4-9 Contributing Existing Flows (2000-2008)
       Figure 4-2 MMSD Force Mains
5. Treatment Facilities
       Figure 5-1 NSWTP Site Plan
       Figure 5-2 MMSD Property Map
       Figure 5-3 Liquid Process Schematic
       Figure 5-4 Solids Process Schematic
       Figure 5-5 NSWTP Hydraulic Modeling Schematic
6. Planning Variable, Regulatory Analyses & Public Involvement
7. Alternative Development
       Figure 7-1 Alternative MP-1A
       Figure 7-2 Alternative MP-1B
       Figure 7-3 Alternative MP-1C
       Figure 7-4 Alternative MP-1D
       Figure 7-5 Alternative MP-2A
       Figure 7-6 Alternative MP-2B
       Figure 7-7 Alternative MP-3A and 3B
       Figure 7-8 Alternative MP4A and MP-4B
8. Alternative Ranking Criteria
9. Alternative Ranking & Evaluation
10. Scenario Planning and Signposts
   
  Appendices
  Note:  Due to their size, the technical memoranda may take several minutes to download.
  Technical Memorandum 1 - Review of Existing Treatment Facilities
  Technical Memorandum 2 - Flow and Loading Projections
  Technical Memorandum 3 - Conveyance Facilities Analysis
  Technical Memorandum 4 - Planning Variables
  Technical Memorandum 5 - Regulatory Review and Analyses
  Technical Memorandum 6 - Scenario Planning Workshops
  Technical Memorandum 7 - Alternative Development
  Technical Memorandum 8 - Planning Alternative Evaluation Criteria
  Technical Memorandum 9 - Planning Alternative Ranking and Evaluation
  Public Involvement Summary
  MMSD 2009 Proposed Capital Projects Budget
  NSWTP Facility Condition Assessment